Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
lab biological waste incineration
1- There are more than 4000 Cubic Meter sludge are packed in Plastic Bags & stored more than 10 years
2- Cleaning and treated 2500 Cubic Meters inside the Oil Tank.
– the waste is biological and coming from lab, can be heavily hazardous in case of terror attack or epidemics or similar events.
– the input is low and occasional, the lab is used when terror or epidemy alarm occures. But occasionly incineration of human or animal carcasses can be demanded.mobile incinerator to work along with a mobile biolab for first responders.is the smallest incinerator available in the market. incinerator of capacities of 10kg/h and 20 kg/h for hospital waste.
medical was incinerators Department of Health
hospital waste management team at a tertiary care hospital ,1250 beeded hsopital .
our daily waste generated from all sources is 0.55kg/bed/day =685kg/day
we need an incinerator of 150kg/hour loading capacity.
plz reply with , buying,installation, running and maintenance cost.incinerators, specifically, medical was incinerators
Department of Health has floated a tender for Incinerator X 1 Unit and the closing date is on 16th June 2011. The specification of the Incinerator is as below:
Specification of Incinerator
1. Should have preparation, Incineration, Scrubber steps to burn waste completely and waste gas should be non-polluted
2. Heavy duty steel, heat resistant coating, stainless steel lid, painted tubular steel frame, 2-blowers, axial vane, suitable drum (S/S, thick) for the incinerator must be provided.
3. Approx. 20 to 25 Kg per batch and the time required for 1 batch not more than 1 hour on average.
4. Ash should be only 5% of the waste material
5. Weight of Incinerator – 50-60 Kg
6. 220V AC
7. Surgical , medical & laboratory waste
8. B X L X H = 4 feet X 8 feet X 6 feet
9. 1 year warranty
10. ISO Certified
11. Mobile Incinerator
12. Electric
MUNICIPAL SOLID WASTE INCINERATORS
a specific type to use at a crematorium. Something that allows specifically for ash collection etc.cremation option to the deceased’s family. Is this product suitable, are ashes easily collected etc. a cremator, for pet clinic, could you introduce and all detail of sales, tax, environtment.-Plastic. 500Kg/hr and to be used maximum 6 times, is this means it will provide only 3 tons per day? Noting that project documents requires 10 tons/day
Plastic bottle-
-Rags & oiled
Glass bottles and aluminum-
-Oils
Fat-
Filter, tires, belts
-Chemicals, paint
Household waste-
Municipal incinerators with a 10-metric ton/24-hour capacity, complete with Stacks, control panels and all accessories, complying with 01015 par. 5.16.1
LOT
2.0
Medical incinerator with a 10 kg/hour (15 lbs/hour) capacity shall be constructed on the site, complete with Stacks, control panels and all accessories , complying with 01015 par. 5.16.2
MUNICIPAL SOLID WASTE INCINERATORS
Municipal waste incinerator quantities and capacities shall be designed for 24-hour 7-day-a-week continuous operation.
Incinerators shall be capable of processing both wet and dry material and operating on either diesel fuel, JP-8 fuel,
or waste oil; see Plumbing for fuel storage system requirements. The following shall be provided as a minimum:
Reinforced concrete mounting foundations, feed or charging hoppers (or loaders), primary combustion chambers
with ash cleanout doors, secondary combustion chambers with ash cleanout doors, cyclone air filters (or separators),
and forced air exhaust stacks (or chimneys).
The charging system shall consist of, as a minimum, a hopper for top feeding and mechanically operated hydraulic
charging ram or augur. To prevent warpage or excessive thermal expansion, a charger cooling system using either
air or water shall be provided.
Primary combustion chamber shall be either the rotary- or stationary fixed-hearth (or kiln) type incinerator. Burner
and combustion air controls shall be fully automatic comprising of, as a minimum, electronic ignition and all
necessary interlocks and safety devices to provide safe operation. The chamber and burner shall be designed to
maintain a minimum combustion temperature of at least 700 to 870 C (1300 to 1600 F), but shall not to exceed 980
C (1800 F). The ash-removal system shall consist of the automatic continuous removal of the ash into an ashquench
pit where cooled by water and removed by conveyor.
Secondary combustion chamber shall be either the rotary- or stationary-hearth (or kiln) type incinerator designed to
oxidize (or burn) the organic vapors and gases. Burner and combustion air controls shall be fully automatic
comprising of, as a minimum, electronic ignition and all necessary interlocks and safety devices to provide safe
operation. The chamber and burner shall be designed to maintain a minimum combustion temperature of at least
930 to 980 C (1700 to 1800 F), but shall not to exceed 1150 C (2100 F). The ash-removal system shall consist of, as
a minimum, the direct manual removal into a dry
Cyclone air filters shall be provided to remove the larger particulates. Cyclone air separators may be provided with
powered fans to increase the velocity of the gases inside the cyclone to improve the collection efficiency for smaller
particles.
5.16.2 MEDICAL WASTE INCINERATORS
Medical waste incinerators shall be specifically designed by the manufacturer to dispose of all medical wastes. All units shall be designed for 8 hours
per day of continuous operation and be rated in quantity per hour (i.e. kg/hr or lbs/hr).
Incinerator loading or charging of medical waste shall be batched-fed manually.
Primary combustion chamber shall be the stationary fixed-hearth (or kiln), multiple-chamber, retort type or larger
capacity rotary-hearth (or kiln) type. Burner and combustion air controls shall be fully automatic comprising of, as a
minimum, electronic ignition and all necessary interlocks and safety devices to provide safe operation. The
chamber and burner shall be designed to maintain a minimum combustion temperature of at least 760 to 870 C
(1400 to 1600 F). The ash-removal system shall consist of the automatic continuous removal of the ash into an ashquench
pit where cooled by water and removed by conveyor.
Secondary combustion chamber shall be a solid-walled and -floored, horizontal, refractory-lined cylinder type
incinerator designed to oxidize (or burn) the organic vapors and gases. Burner and combustion air controls shall be
fully automatic comprising of, as a minimum, electronic ignition and all necessary interlocks and safety devices to
provide safe operation. The chamber and burner shall be designed to maintain a minimum combustion temperature
of at least 930 to 1200 C (1700 to 2200 F) with a minimum gas residence (or dwell) time of 2.0 seconds. The ashremoval
system shall consist of, as a minimum, the direct manual removal into a dry collection hopper.
Cyclone air filters shall be provided to remove the larger particulates. Cyclone air separators may be provided with
powered fans to increase the velocity of the gases inside the cyclone to improve the collection efficiency for smaller
particles.
5.16.3 INCINERATOR STACKS (OR CHIMNEYS)
Stack size shall be in accordance with the manufacturer’s recommendations. Stacks shall be the forced-air type and
completely self-supporting and unattached to nearby structures. As a minimum, stack heights shall minimize
downwash of stack emissions due to aerodynamic influences from nearby structures and be calculated in accordance
with DoD 4715.05-G, Overseas Environmental Baseline Guidance Document. Stacks shall be provided with
corrosion-resistant steel weather caps.”
Incinerators
burn between 5000-10000 kg per hour.Mostly waste from crude oil tanks. construction, installation and 6 months maintenance cost including specifications.CMSD for Double Chamber Rotary Klin Type Incinerator (1st Chamber temperatur not less than 850 degree centrigrade & 2nd Chamber Temperature not less than 1200 c with exhaust pipe 100 meter long with emission gas filtering mechanism ), Hydroclave (Medical) with anciliary equipments operating parameters : Temperature 250-275 degree feren , Pressure 15-35PSI , Sterilization time 30 minus , Batch capacity -463 kg . two Incinerators for a hospital in VN. The anticipated capacity is approximately 1,000 kg per day.
Incenerator System
Incenerator | ||
Supply, installation and testing of medical waste incinerator with a capacity of 75 kilograms / hour, operated by LPG and including all accessories with chimney in accordance with the technical specifications and public health regulations | Item | 2 |
Incinerators room for 3 incinerators as item 3-1-1, and waste store for keeping wastes for 7 days, including all constructions by reinforced concrete with Incenerator and store equipment, all wiring, lighting, water supply and drainage | Item | 1 |
Provide Incinerators room & waste store with fire fighting system, including sprinklers, approval of water source at site, fire alarm system contains sensors for heat & smoke, to be linked with the hospital fire alarm systems | Item | 1 |
Supply, installation & testing of ventilation system of Incenerator room & store by ROOF TOP EXHAUST FANS with HEPA FILTER, rate of change of air 5 times per hour, with ducts and air grills | Item | 1 |
Supply, installation & testing DUCTED SPLIT UNITS at waste store with sufficient capacity to maintain the internal temperature at 14 degrees Celsius in summers and winters | Item | 1 |