Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
HIGH TECH PYROLYTIC MEDICAL WASTE INCINERATOR
HIGH TECH PYROLYTIC MEDICAL WASTE INCINERATOR
1. Capacity of destruction in weight: 60 Kg/h.
2. It should be able to operate not less than 10 hours/day
3. This incinerator must be able to destruct all combustible wastes produced by hospitals,
private clinics, laboratories, institutes, etc…
4. Design Specification : Types A, B, C, D, and E of medical waste
5. PYROLYTIC” combustion, by controlling the gasification of waste.
6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the
loadings.
7. It should be able to reduce the volume of wastes by 98%.
8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9. The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
• The Temperatures of combustion: Minimum will be 850°C and max 1400°C
• Post combustion: > 1100°C.
11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70×70.
14. Burner operation should be Automatic On/Off
15. Fuel: diesel
16. The supplier must provide necessary information for the best of the installation This incinerator
with “PYROLYTIC” combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch
Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and
stuffing insulating out of refractor.-.
* The insulation of the combustion chamber should be composed of refractory bricks,
having a high content of aluminium and insulates bricks in order to assure a minimum
temperature on the outside sheet metal.
* Composition of the refractory;
• Refractory concrete:
> Thickness: > 100 mm ”
> Nature: 42% of A1203
• Insulate in fibrous panels :
> Thickness: > 75 mm
> Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging
flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice
gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
• Refractory concrete :
> Thickness: > 150 mm
> Nature: 65% of A1203
• Insulate in fibrous panel:
> Thickness: > 85 mm
> Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of
electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating
valve.
* A secondary injection of air to ensure perfect oxygen content.
19. A control box ensuring the complete cycle of combustion.
20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being
carried out by valves and following the control of the automatic cycle.
21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion,
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing
should be Automatic or manual batch de ashing.
22. Process Filtering system: Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the
incinerator.
23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perforn an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician from the
factory; it will consist of curative and preventive maintenance, and the use of machine, etc
NB.; Civil works and any other related services for the installation and training of operators must be included in the incinerator’s price.
Specification for the shelter of the incinerator:
House of the incinerator inclusive in offer (the house must have toilet and hand washing facilities and firefighting). The size of the shelter shall measure four meter by six meter and shall be provided with adequate air ventilation.
This material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG
Capacity of destruction in weight 60 Kg/h
medical waste incinerator solutions and prices for 100 bed / 500 bed / 1000 bed / 3000 bed hospitals.
– Assumption: general hospital beds 50%, operation beds 50% for the 100 bed hospital case, while this
ratio is 30-70% for the other cases
– international standards and waste creations assumptions should apply
INCINERATOR, DIESEL.
CAPACITY : Burner 150 kg/hr.
Quantity : Two [2] with complete accessories.
Types of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, vinyl acetate plastic, synthetic
plastics,
natural rubber, synthetic rubber, polyurethane sheet, and bulky films, solids and
– particles that can be easily sorted
– Items that easily degenerate such as paper, wood, leather and garbage
– Chemical waste solids and liquids, waste oil and other difficult-to-handle items
The machines will be certified for operation from PME after passing site investigations.Manual load twin chamber
incinerator for medical waste to burn 50kg/hr on continuous operation, with Primary temperature in the region of
800degC minimum and 1200degC or more in the Secondary chamber, complete with charging door, Ash door, Air and view
ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition unit, the whole to
meet NEMA requirements and other international standards. Здравствуйте! Меня интересует пе
чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж
ду ответа. Стоимость и доставка до г.Алматы Казахстан
The technical details we care about are:
– Capacity (burning capacity of waste per hour). 150kg/hour.Incinerator with 300l waste chamber
– Build materials, 5mm High quality mild steel construction ; 100 mm high quality refractory lining.
– High Temperature paint finish.we have 2 hospitals,more then 20 dentist offices,and over 50 doctor offices.
would it be possible to give us info on the capacity of incinerator we need
on this island.
– Up to 150 KG/Hrs. incinerator to dispose our daily normal mortality for this size of the farm.1.can the
100kg/hr burn solid waste/hazardous waste like expired paints,waste oil or chemicals.
2.What about the heat generated during burning,are there windows or air flow into the containers.
– Consumption of power and fuel. hospital waste disposal system for a hospital project
– Ash removal odor.The incinerator is for HAZARDOUS WASTE and SOLID WASTE and minimal carbon emission.
– Automatic curing process temperature controlled chamber.Incinerator with 150l waste chamber
– Secondary chamber.
1. Do you have plans for above incinerators showing floor dimensions ,height. INCINERATOR FOR SMALL ANIMALS ABOUT 70-
100 KGR/PER TIME
2. What materials should be used for the FLOOT, WALLS, ROOF ETC.1) The only consumable required for the system TS100
(PLC) is Oil( diesel) is that OK?
2) from your technical specification: oil consumption (Kg/hour) is between 14–28) do you mean is liters/hour?
example the incinerator will be operating for 10 hours per day means the oil consumption will be ~140 Liters or more?
3) Chimney type stainless steel. how about main body construction materials?if there are more two option of main body
construction materials for better lifetime
3. Send info about electricity, ventilation, fire protection, exhausts, chimney etc
4.Do you have prefabricated shelters?Installation of waste disposal system (biomedical) 500kg capacity model, MP 500
medical incinerator.
5. We see you have container shelters . Send us price estimate for this item
1. Capacity of destruction in weight: 60 Kg/h.
2. It should be able to operate not less than 10 hours/day
3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics,
laboratories, institutes, etc…
4. Design Specification : Types A, B, C, D, and E of medical waste
5. “PYROLYTIC” combustion, by controlling the gasification of waste.
6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
7. It should be able to reduce the volume of wastes by 98%.
8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9. The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
• The Temperatures of combustion: Minimum will be 850oC and max 1400oC
• Post combustion: >1100oC.
11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70×70.
14. Burner operation should be Automatic On/Off
15. Fuel : diesel
16. The supplier must provide necessary information for the best of the installation
This incinerator with “PYROLYTIC” combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating
out of refractory.
* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium
and insulates bricks in order to assure a minimum temperature on the outside sheet metal.
* Composition of the refractory;
• Refractory concrete :
. Thickness : ≥100 mm
. Nature: 42% of Al203
• Insulate in fibrous panels :
. Thickness: ≥75 mm
• Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of
electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total re-combustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
• Refractory concrete :
Thickness : ≥150 mm
Nature: 65% of Al203
• Insulate in fibrous panel :
Thickness: ≥85 mm
Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic
ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19. A control box ensuring the complete cycle of combustion.
20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and
following the control of the automatic cycle.
21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of post combustion.
* Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual
batch de ashing.
22. Process Filtering system: Scrubber to be mentioned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perform an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician
from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc
Incinerator capable of treating between 300 & 500 kgs fitted with the wet scrubber system
Automatic loading and reloading with capacity of 10 to 12 tons per day working with gas treatment methods and gas fuel and should comply with the European Standards.the Government Hospital for Medical Waste Incinerator with the following Specifications. they are having general wastes like tissues, plastic bottles etc ,wastes coming from labour camps, to be incinerated, they need, 50kg/hr incinerator
MEDICAL WASTE INCINERATOR.our hospital produce 40 kg every day from all waste material
– Capacity: 1000 kg/h
– Type waste: industrial waste
– Other requirements: Automatic waste loading system and exhaust treatment system.
1. Capacity: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per batch: 3.2hrs
4. Fuel consumption: 7 litres per batch. Incinerator capable of treating between 300 & 500 kgs fitted with the wet scrubber system.complete Incinerator with a capacity of 500kgs/ hr with a wet scrubber unit. a 10-20Kg per hour of domestic waste? Also, I would like to know what is the minimum capacity incinerator you have in case we need something smaller?a Waste Incinerator of 500 Metric Tonne per day burning capacity as I am in possession of a large volume of mixed/municipal waste (4/5 million tonnes) of the following composition (52% organic, 12% plastic, 16% paper, 6% metal, 4% glass and 10% other).The EU codes of the waste are as follows: 20 03 01, 19 12 10 and 19 12 12.
One of the key deciding factors of the potential supplier is the energy consumption of the plan, indicated either per hour or per day and I would appreciate if such information can be made available.
Animal body parts,other biomedical waste,organs dung
51.No Features $_pecific tions
1 (Incinerator)
Type of waste for disposal Animal body parts,other biomedical waste,organs dung, bedding materials,plant p缸ts and food itemsι
Incinerators for conversion of waste to fine,white sterile
ash with no visible smoke or odour
2. Load capacity 300 – 4∞Kg (maximum)
3. Bum capacity 100 Kgjhr (minimum)
4 Fuel Diesel (LDOjHSD)
5. Type of Bumer operation Automatic diesel fired
6. Primary chamber Solid hearth
Dense refractory concrete lining
Operating temeeralure of 850 土 50 deg C or more
7. Secondary chamber Slid heath
Dense refractory concrete lining
Opera恤19 temperature of 1∞o deg C or more
8. Temperature control Digital temperature control and display
Temperature monitoring and thermostatic control
9. Power supply 220V for control Box
10 Size Compact design preferred
11. Opening lid Large top open归g lid (Approx . 700 mm x 500mm) for
easy loading
12. Fuel tank 100-150 L
13. Civil works, installation and
comnuss!Onmg lndusive of civil works (brick wall incinerator house
with a shutter door,CGI sheet roofing) according to 由e
model of the incinerator.
lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation .
Electric power supply line to light incinerator house as well as to control box of the incinerator
Onsite demonstrationjperformance test and adequate training of staff on the use of incinerators.
Warranty of one year from the date of commissioning. Separate Annual Maintenance Contract would be drawn with the supplier at a later stage.
14. Catalogue Catalogue containing detail pictures and spec迁ications
of the quoted incinerator must be included in the
bidding document
incineration Furnace for burning patalogical
incineration Furnace for burning patalogical ( such as human tissue or blood ) as west
The weight of this west materials is 700 kg per month and we need an isolated furnace
Without fume and any harmful gas
. INCINERATOR SPECIFICATION
# Description Specification
1 Burning Capacity – 400 kg/time and should not be less than 300 kg/time. Maximum combustion time must be 6 times/day
2 Chimney external diameter – 300 to 400 mm
3 Fan power – Must not exceed 1.1kw
4 Voltage – 220V
5 Oil consumption – Must not exceed 14kg/h
6 Feeding door diagonal dimension (mm) – Not less than 500mm
7 Incineration Temp. (⁰C) – 800 or above
8 Emission
CO – Must not exceed 100 mg/m3
SO2 – Must not exceed 400 mg/m3
HF – (Hydrogen fluoride) Must not exceed 9.0 mg/m3
NO2 – Must not exceed 500 mg/m3
Smoke dust – Must not exceed 100 mg/m3
9 Height of the Incinerator – Not less than 10m above ground level
10 Manufacturer’s Warranty – Not less than 1 year
11 Electrical Connection – From nearest distribution box using 25mm2 electrical cable and all related connections and wiring